



Product Overview:
This ls ANon-asphalt Based High-polymer Self-adhesive Waterproof Membrane(pre-laid)consisting ofHigh -density Polyethylene,thermoplastic Polyolefin, Thermoplastic Elastomer High-performance Hot-MeltAdhesive Layer,weather-resistant lsolation Sand ,and Produced Through Special Coating Process.
Product Features:
1.The Waterproof Function Layer ls Designed To Form AComposite Waterproof System With The Structure,lmproving The Safety And Reliability Of The Waterproofing Project.
2.Good Environmental Adaptability, With Performance Not Reduced After Continuous Exposure For45Days Or More.
3.The Coating ls Sprayed ln AThree-dimensional Manner,With Good Adhesion ToThe Later Poured Concrete.
4.Designed To Be Dust-proofAnd Resistant To Stepping,Allowing For Normal Human Traffic During Construction.
5.Strong Plastic Deformation Ability, Perfectly Demonstrating The Application Performance Of High-polymer Sheets.
6.The Micro-design System (technology)Balances TheAdhesiveAnd Peel-off Effects ,Making WaterproofDefects Controllable.
7.High-polymer Sheets Are Flexible, Dense,And Have Good Corrosion Resistance, Allowing For SpecialEnvironmentalAdaptability.Environmentally Friendly Design For Energy Conservation And EnvironmentalProtection.
8.Standardized Construction Process, With Reliable Overlap Fixing
Application Scope:
1.Transportation Engineering:waterproofAnd Seepage Prevention Projects Such As Subway.tunnels,Caves,bridges,etc..
2.Building Engineering:waterproof Projects For Roofs,basements,etc...
3.Water ConservancyEngineering:waterproofAnd Seepage Prevention Projects For Reservoirs,dams,Dikes,canals,artificial Lakes,etc...
4.Environmental Engineering:waterproof And Seepage Prevention Projects For Landfills,sewageTreatment Plants,metallurgicalAnd Chemical Plants,etc....
Construction Method:
Flat Surface Construction:
Clean The Base Layer →Snap Lines On The Base Layer →lay The Pre-laid Non-stick Membrane →overlapTreatment→detailed Node Treatment→tie The Steel Bars→pour Concrete.
Vertical Surface Construction:
Install Vertical Supports→snap Lines On The Base Layer→lay The Pre-laid Non-stick Membrane And MechanicallyFix lt→overlap Treatment→detailed Node Treatment→tie The Steel Bars→pour Concrete.
Tunnel Roof Construction:
lnstall Vertical Supports→snap Lines On The Base Layer→layThe Pre-laid Non-stick Membrane AndMechanically Fix lt→overlapTreatment→detailed Node Treatment—tie The Steel Bars→pour Concrete.
Product Specification

Execution Indicator《Pre-laid waterproofing membrane》(GB/T23457-2017)P/R

